Connect with us

Energy News

ADB Approves $73 Million Package to Develop Waste-to-Energy Facility in Maldives

Published

on

The Asian Development Bank (ADB) has approved a $73.39 million concessional loan and grant to the Government of Maldives to develop a waste treatment facility using waste-to-energy (WTE) technology and disposal infrastructure for the Greater Malé region and neighboring outer islands.

Greater Malé and its neighboring 32 outer islands—which host 86 tourist resorts—suffer from severe environmental pollution and deteriorating livability due to inadequate collection and haphazard disposal of solid waste. Over 830 tons per day (tpd) of solid waste are generated in the area and dumped or burned at the 10-hectare dump site on Thilafushi island. Established in 1992, this dump site has no pollution control measures. The site contaminates the surrounding environment and is a public health and environmental hazard threatening fisheries and tourism.

“The project will significantly improve Maldives’ solid waste management through the provision of efficient and sustainable treatment and disposal infrastructure,” said ADB Urban Development Specialist for South Asia Luca Di Mario. “The WTE facility will be a pivotal component of an integrated solid waste management system, which will improve public and environmental health, especially ocean health.”

The project will establish a WTE plant with a capacity of 500 tpd, 2 treatment lines of 250 tpd each, an 8-megawatt electricity surplus energy recovery facility, an air pollution control system, and a landfill for safe disposal of air pollution control residues and non-marketable incineration bottom ash. The WTE treatment process minimizes land requirements for waste disposal and produces renewable energy addressing the critical land and electricity constraints of developing small island countries like Maldives.

All facilities will adopt disaster- and climate-resilient features to respond to future disaster and climate change threats, such as sea level rise. The WTE plant will be implemented through a design-build-operate modality with the private sector, with a 15 years operation and maintenance period.

The project will also strengthen the institutional capacity of the Ministry of Environment (MOE) and Environmental Protection Agency (EPA) to supervise WTE operations, enhance operation and maintenance cost recovery, and improve public awareness on sustainable waste management practices.

The total cost of the project is $151.13 million. The Asian Infrastructure Investment Bank plans to provide a $40 million loan as cofinancing. The Japan Fund for the Joint Crediting Mechanism will provide a $10 million grant to finance expenditures related to WTE design and construction, contingencies, and consulting services for the certification of greenhouse gas emission reduction from the WTE plant. ADB is providing a $500,000 grant for the institutional capacity strengthening of MOE and EPA. The Government of Maldives will contribute $27.74 million to the project.

Continue Reading
Comments

Energy News

Policy Measures to Advance Jordan’s Transition to Renewables

Published

on

A new report published today by the International Renewable Energy Agency (IRENA) has identified a series of policy measures that can help advance the energy transition towards renewable energy in Jordan.

The “Renewables Readiness Assessment: The Hashemite Kingdom of Jordan” – developed in co-operation with Jordan’s Ministry of Energy and Mineral Resources, suggests opportunities exist to deepen private sector engagement in national efforts to reach a 31 per cent share of renewables in total power by 2030.

“The recommendations of this report comply with the newly issued Energy strategy 2020-2030 and its action plan,” said H.E. Engineer Hala Zawati, Minister of Energy and Mineral Resources in Jordan. “We are fully aware that to achieve all these ambitious targets, a strong partnership between the public and private sectors is needed. We are also eager to work with international friends and partners to make renewable energy a main pillar of the Jordan energy sector.”

The report presents policy action areas to increase energy security and boost supply diversity through the accelerated uptake of renewables and includes ideas to boost end-use electrification and increase the availability of energy transition investments from domestic institutions.

Jordan’s share of electricity from renewables grew from almost zero in 2014 to around 20 per cent in 2020 thanks to enabling frameworks and policies that have supported the deployment of renewable energy technologies, including solar photovoltaic (PV) and onshore wind.

“Jordan boasts significant renewable energy resource potential that if realised will reduce consumer energy costs, improve national energy security, create jobs and stimulate sustainable growth – boosting post COVID-19 economic recovery efforts,” said IRENA Director-General Francesco La Camera. “This report highlights a series of policy and regulatory measures that will allow Jordan to build on its energy transition progress to date and align it with 2030 national decarbonisation goals.”

Capacity building in local financing institutions and project developers can drive their engagement in the energy transition, the report says, while helping the country to meet its needs in important areas such as the build-out of electric charging infrastructure for the transport system.

Challenges associated with integrating higher shares of renewables in Jordan can be addressed by building and upgrading transmission and distribution infrastructure, deploying storage, promoting demand-side management and incentivising electrification of heating, cooling and transportation.

Renewables Readiness Assessment: Jordan lists concrete recommendations around the following seven action areas:

  • Provide the conditions for renewables to grow in the power sector
  • Foster continued growth of renewable power generation
  • Plan for the integration of higher shares of renewable power
  • Incentivise the use of renewables for heating and cooling
  • Support renewable options for transport and mobility
  • Catalyse renewable energy investment
  • Strengthen local industries and create jobs in renewables

Read the full report

Continue Reading

Energy News

World Bank Supports Angolan’s Electrification with $250 Million

Published

on

The World Bank approved $250 million to improve the operational performance of the electricity sector utilities and increase electricity access in selected cities of Angola.

The  Electricity Sector Improvement and Access Project will finance electrification investments in the provinces of Luanda, Benguela, Huila, and Huambo, delivering 196,500 new electricity connections that will benefit close to one million people and 93,857 public lights.

The project will focus on electricity access expansion and improvement of revenue collection, electricity service improvement, capacity improvement of the public electricity producer (PRODEL, Empresa Pública de Produção de Electricidade), and strengthening sustainable management of generation plants. The project also aims to increase the commercial performance of the national electricity distribution company (Empresa Nacional de Distribuição de Electricidade, ENDE) as well as provide financing to the national transport network Rede Nacional de Transporte, RNT) for targeted interventions to improve and optimize the dispatch of electricity supply and the overall management of the national transmission network. Furthermore, the Project will also finance immediate measures to raise the operational, commercial and technical capacity  of  the three national power utilities, leading to significant electricity service improvement.

“Investment in infrastructure, especially in energy, is key to  economic development ”, said Jean-Christophe Carret, World Bank Country Director to Angola “Quality access to electricity services will have a spillover effect in many other sectors, including agribusiness, health, education, just to name a few.”

Angola’s power generation capacity, largely based on hydropower, has developed at a fast pace with the national installed generation capacity quadrupling in just one decade, but transport, distribution and cost recovery remain very challenging. Less than 40 percent of Angolans have access to electricity, with inadequate electricity services impacting poverty, productivity and regional disparities. Therefore, the project aims to deliver the most critical actions needed to help expand electricity access, improve the operational and commercial performance of utilities, and ultimately boost their creditworthiness. This, in turn, will contribute to reducing extreme poverty, improving the resilience of communities to impacts arising from COVID-19, and increasing shared prosperity.

The total project cost is $417 million, financed with a $250 million loan from the World Bank and a credit of $167 million from Agence Française de Développement.

Continue Reading

Energy News

IEA and SICA to collaborate on clean energy transitions in Central America

Published

on

The International Energy Agency (IEA) and the Central American Integration System (SICA) have signed a Memorandum of Understanding (MoU) to promote clean energy transitions in Central America. Under the MoU, the two organisations will expand their cooperation on energy data and statistics, energy efficiency and climate resilience of electricity systems. These have all been identified as key areas for energy transitions and climate change mitigation in the region under SICA’s Central American 2030 Sustainable Energy Strategy.

“The IEA is pleased to team up with SICA to expand our work in Central America, a dynamic region that is home to over 55 million people and has excellent clean energy potential with distinctive transition opportunities and challenges,” said IEA Deputy Executive Director David Turk. 

Under its Clean Energy Transitions Programme, the IEA has been expanding its collaboration in Latin America. This is taking place both bilaterally with key partner countries – including the two largest economies, Brazil and Mexico – and on a regional level through cooperation with leading regional organisations, including the Latin American Energy Organisation (OLADE) and the Inter-American Development Bank. The signing of the IEA-SICA Memorandum of Understanding is a new milestone for the IEA’s engagement with the region. 

“Today’s signing ceremony marks an important step for SICA’s work on clean energy transitions – an important priority for our member countries, which can now benefit from the IEA’s leading analysis and expertise,” said Vinicio Cerezo, SICA Secretary General.

The Central American Integration System (Sistema de Integración Centroamericana, or SICA) is an economic and political organisation composed of Belize, Costa Rica, El Salvador, Guatemala, Honduras, Nicaragua, Panamá and the Dominican Republic, that works to foster closer ties and integration across Central America and the Dominican Republic to promote peace, liberty, democracy and development in the region.

Continue Reading

Publications

Latest

Trending